| 1 |
AHLI MUDA BIDANG KEAHLIAN TEKNIK SUMBER DAYA AIR |
28
|
| 2 |
AHLI MADYA BIDANG KEAHLIAN TEKNIK SUMBER DAYA AIR |
31
|
| 3 |
Manajer Pengelolaan Bangunan Gedung |
11
|
| 4 |
PELAKSANA LAPANGAN PEKERJAAN JALAN |
8
|
| 5 |
Manajer Lapangan Pelaksanaan Pekerjaan Gedung |
6
|
| 6 |
PELAKSANA LAPANGAN PEKERJAAN SALURAN IRIGASI |
10
|
| 7 |
AHLI MADYA TEKNIK JALAN |
27
|
| 8 |
PELAKSANA PEMELIHARAAN JALAN |
12
|
| 9 |
AHLI MUDA TEKNIK BANGUNAN GEDUNG |
15
|
| 10 |
AHLI MADYA TEKNIK BANGUNAN GEDUNG |
22
|
| 11 |
PELAKSANA LAPANGAN PEKERJAAN GEDUNG MADYA |
7
|
| 12 |
PERAKIT STRUKTUR BANGUNAN RISHA |
11
|
| 13 |
TUKANG BANGUNAN GEDUNG LEVEL 1 |
12
|
| 14 |
PELAKSANA LAPANGAN PERKERASAN JALAN BETON MADYA |
9
|
| 15 |
PELAKSANA LAPANGAN PEKERJAAN JALAN MADYA |
8
|
| 16 |
PELAKSANA LAPANGAN PEKERJAAN JALAN LEVEL 2 |
6
|
| 17 |
PELAKSANA LAPANGAN PEKERJAAN SALURAN IRIGASI MADYA |
10
|
| 18 |
PELAKSANA LAPANGAN PEKERJAAN SALURAN IRIGASI LEVEL 2 |
8
|
| 19 |
PELAKSANA LAPANGAN PEKERJAAN BANGUNAN PENGAMAN PANTAI MADYA |
5
|
| 20 |
Operator Muda Survei Terestris |
4
|
| 21 |
AHLI MUDA PERENCANA BETON PRACETAK UNTUK STRUKTUR BANGUNAN GEDUNG |
9
|
| 22 |
MANAJER PENGELOLAAN BANGUNAN GEDUNG |
20
|
| 23 |
PELAKSANA LAPANGAN PEKERJAAN GEDUNG (LEVEL 6) |
10
|
| 24 |
PELAKSANA LAPANGAN PEKERJAAN GEDUNG (LEVEL 5) |
9
|
| 25 |
PELAKSANA LAPANGAN PEKERJAAN GEDUNG (LEVEL 4) |
8
|
| 26 |
KEPALA TUKANG BANGUNAN GEDUNG |
13
|
| 27 |
PENGAWAS PEKERJAAN BANGUNAN GEDUNG (LEVEL 5) |
8
|
| 28 |
JURU GAMBAR KEPALA BIDANG KONSTRUKSI |
14
|
| 29 |
JURU GAMBAR KONSTRUKSI |
12
|
| 30 |
JURU GAMBAR PEMULA KONSTRUKSI |
9
|
| 31 |
KEPALA TUKANG PASANG PERANCAH DAN ACUAN/CETAKAN BETON |
7
|
| 32 |
TEKNISI LABORATORIUM BETON ASPAL (LEVEL 4) |
7
|
| 33 |
TUKANG PASANG PERANCAH DAN ACUAN/CETAKAN BETON |
5
|
| 34 |
AHLI MUDA TEKNIK JALAN |
22
|
| 35 |
AHLI MADYA TEKNIK JALAN |
27
|
| 36 |
TUKANG KAYU KONSTRUKSI |
13
|
| 37 |
TUKANG PASANG RANGKA BAJA RINGAN |
4
|
| 38 |
TUKANG PASANG BATA DAN PLESTERAN |
12
|
| 39 |
TUKANG PASANG UBIN/KERAMIK |
5
|
| 40 |
TUKANG CAT BANGUNAN GEDUNG |
8
|
| 41 |
TUKANG BESI BETON |
5
|
| 42 |
AHLI MUDA TEKNIK JEMBATAN |
10
|
| 43 |
AHLI MADYA TEKNIK JEMBATAN |
11
|
| 44 |
TUKANG PASANG WATER PROOFING |
7
|
| 45 |
TUKANG PASANG PENUTUP ATAP |
7
|
| 46 |
PELAKSANA PEMELIHARAAN JEMBATAN (LEVEL 6) |
9
|
| 47 |
AHLI MADYA PENGAWAS PELAKSANAAN KONSTRUKSI BANGUNAN SIPIL PEMBANGKIT LISTRIK TENAGA MINI HIDRO |
7
|
| 48 |
INSPEKTUR BENDUNGAN URUKAN (LEVEL 6) |
6
|
| 49 |
MANDOR PEKERJAAN TIMBUNAN TUBUH BENDUNGAN TIPE URUGAN |
3
|
| 50 |
TUKANG PASANG/PERAKIT JEMBATAN RANGKA BAJA PANEL DARURAT |
4
|
| 51 |
AHLI UTAMA TEKNIK JALAN REL |
17
|
| 52 |
PELAKSANA PEMASANGAN PINTU AIR (LEVEL 6) |
6
|
| 53 |
PENGAWAS PEKERJAAN PENGELASAN REL KERETA API (LEVEL 5) |
14
|
| 54 |
AHLI UTAMA PENILAI LAIK FUNGSI BANGUNAN GEDUNG |
15
|
| 55 |
PELAKSANA LAPANGAN PEKERJAAN BANGUNAN PENGAMAN PANTAI (LEVEL 5) |
6
|
| 56 |
PENGAWAS KONSTRUKSI, FABRIKASI, SIPIL DAN STRUKTUR |
13
|
| 57 |
AHLI MUDA HIDROLOGI |
7
|
| 58 |
AHLI MADYA HIDROLOGI |
8
|
| 59 |
TEKNISI LABORATORIUM TANAH (LEVEL 4) |
8
|
| 60 |
TEKNISI LABORATORIUM TANAH (LEVEL 5) |
9
|
| 61 |
TEKNISI LABORATORIUM TANAH (LEVEL 6) |
10
|
| 62 |
PELAKSANA PRODUKSI CAMPURAN ASPAL PANAS (LEVEL 5) |
6
|
| 63 |
PENGAWAS LAPANGAN PEKERJAAN DRAINASE PERKOTAAN (LEVEL 6) |
7
|
| 64 |
PELAKSANA PRODUKSI CAMPURAN ASPAL PANAS (LEVEL 4) |
6
|
| 65 |
PELAKSANA LAPANGAN PEKERJAAN JALAN (LEVEL 4) |
18
|
| 66 |
PELAKSANA LAPANGAN PEKERJAAN BANGUNAN AIR LIMBAH PERMUKIMAN (SETEMPAT DAN TERPUSAT) (LEVEL 4) |
6
|
| 67 |
PELAKSANA LAPANGAN PEKERJAAN JALAN (LEVEL 5) |
20
|
| 68 |
PELAKSANA LAPANGAN PEKERJAAN JALAN (LEVEL 6) |
23
|
| 69 |
TEKNISI GEOTEKNIK (LEVEL 6) |
6
|
| 70 |
AHLI MADYA TEKNIK JALAN REL |
16
|
| 71 |
AHLI MUDA TEKNIK JALAN REL |
15
|
| 72 |
PELAKSANA LAPANGAN PEKERJAAN PEMBANGUNAN JALAN REL (LEVEL 4) |
8
|
| 73 |
MANDOR PEMELIHARAAN JALAN |
6
|
| 74 |
PELAKSANA LAPANGAN PEKERJAAN JEMBATAN RANGKA BAJA PANEL DARURAT |
7
|
| 75 |
PELAKSANA LAPANGAN PEKERJAAN GROUTING (LEVEL 5) |
9
|
| 76 |
PENGAWAS LAPANGAN PEKERJAAN JEMBATAN RANGKA BAJA PANEL DARURAT |
6
|
| 77 |
PELAKSANA LAPANGAN PEKERJAAN JEMBATAN RANGKA BAJA (LEVEL 5) |
5
|
| 78 |
AHLI UTAMA TEKNIK BANGUNAN GEDUNG |
36
|
| 79 |
PELAKSANA LAPANGAN PEKERJAAN JEMBATAN RANGKA BAJA (LEVEL 6) |
6
|
| 80 |
AHLI UTAMA BANGUNAN GEDUNG HIJAU |
18
|
| 81 |
KEPALA TUKANG PASANG/PERAKIT JEMBATAN RANGKA BAJA PANEL DARURAT |
5
|
| 82 |
PELAKSANA LAPANGAN PEKERJAAN SALURAN IRIGASI (LEVEL 4) |
13
|
| 83 |
PELAKSANA LAPANGAN PEKERJAAN SALURAN IRIGASI (LEVEL 5) |
16
|
| 84 |
PELAKSANA PEKERJAAN PEMELIHARAAN SUNGAI (LEVEL 4) |
9
|
| 85 |
PELAKSANA PEKERJAAN PEMELIHARAAN SUNGAI (LEVEL 5) |
11
|
| 86 |
PENGAWAS PENGEBORAN AIR TANAH (LEVEL 5) |
7
|
| 87 |
PENGAWAS PENGEBORAN AIR TANAH (LEVEL 6) |
8
|
| 88 |
PELAKSANA PENGEBORAN AIR TANAH (LEVEL 4) |
7
|
| 89 |
AHLI MUDA TEKNIK BANGUNAN AIR LIMBAH (SPALD) |
5
|
| 90 |
AHLI MADYA TEKNIK BANGUNAN AIR LIMBAH (SPALD) |
6
|
| 91 |
PELAKSANA PEMBUATAN FASILITAS SAMPAH DAN LIMBAH (LEVEL 4) |
3
|
| 92 |
AHLI UTAMA MATERIAL JALAN |
9
|
| 93 |
PELAKSANA PEMBUATAN FASILITAS SAMPAH DAN LIMBAH (LEVEL 5) |
4
|
| 94 |
AHLI UTAMA TEKNIK JALAN |
29
|
| 95 |
AHLI UTAMA KESELAMATAN JALAN |
8
|
| 96 |
AHLI UTAMA TEKNIK JEMBATAN |
12
|
| 97 |
AHLI MUDA TEKNIK BANGUNAN PERSAMPAHAN (TPA) |
4
|
| 98 |
AHLI UTAMA PERENCANAAN JEMBATAN RANGKA BAJA |
7
|
| 99 |
AHLI MADYA TEKNIK BANGUNAN PERSAMPAHAN (TPA) |
5
|
| 100 |
AHLI UTAMA TEKNIK BENDUNGAN BESAR |
50
|
| 101 |
AHLI UTAMA OPERASI DAN PEMELIHARAAN BENDUNGAN TIPE URUKAN |
11
|
| 102 |
AHLI UTAMA TEKNIK PERENCANAAN IRIGASI RAWA |
9
|
| 103 |
AHLI UTAMA TEKNIK IRIGASI |
15
|
| 104 |
AHLI UTAMA TEKNIK RAWA |
8
|
| 105 |
AHLI UTAMA PERENCANAAN OPERASI DAN PEMELIHARAAN PRASARANA SUNGAI SERTA PEMELIHARAAN SUNGAI |
9
|
| 106 |
PELAKSANA LAPANGAN PEKERJAAN DRAINASE PERKOTAAN (LEVEL 4) |
6
|
| 107 |
AHLI UTAMA TEKNIK PANTAI |
25
|
| 108 |
AHLI UTAMA HIDROLOGI |
13
|
| 109 |
AHLI UTAMA BIDANG KEAHLIAN TEKNIK SUMBER DAYA AIR |
32
|
| 110 |
AHLI UTAMA HIDROLIKA |
8
|
| 111 |
AHLI UTAMA PERENCANAAN JARINGAN DRAINASE |
10
|
| 112 |
AHLI UTAMA GEOLOGI PEKERJAAN KONSTRUKSI |
9
|
| 113 |
PELAKSANA LAPANGAN PEKERJAAN DRAINASE PERKOTAAN (LEVEL 5) |
7
|
| 114 |
AHLI UTAMA GEOTEKNIK |
21
|
| 115 |
TEKNISI SONDIR (LEVEL 4) |
7
|
| 116 |
TEKNISI SONDIR (LEVEL 5) |
8
|
| 117 |
AHLI UTAMA TEKNIK DERMAGA |
35
|
| 118 |
AHLI UTAMA PELAKSANAAN PEMBONGKARAN BANGUNAN |
6
|
| 119 |
TEKNISI PENGEBORAN PENGUJIAN TANAH (LEVEL 4) |
7
|
| 120 |
TEKNISI PENGEBORAN PENGUJIAN TANAH (LEVEL 5) |
8
|
| 121 |
OPERATOR ALAT PENYELIDIKAN TANAH (SOIL INVESTIGATION OPERATOR) |
6
|
| 122 |
OPERATOR PEMULA ALAT PENYELIDIKAN TANAH (SOIL INVESTIGATION OPERATOR) |
5
|
| 123 |
AHLI MUDA TEKNIK BANGUNAN GEDUNG |
21
|
| 124 |
AHLI MUDA BANGUNAN GEDUNG HIJAU |
5
|
| 125 |
AHLI MADYA BANGUNAN GEDUNG HIJAU |
17
|
| 126 |
PENGAWAS PEKERJAAN PENGELASAN REL KERETA API (LEVEL 6) |
18
|
| 127 |
PELAKSANA PERAWATAN FASILITAS PELABUHAN (LEVEL 5) |
16
|
| 128 |
PELAKSANA PERAWATAN FASILITAS PELABUHAN (LEVEL 6) |
25
|
| 129 |
APLIKATOR BANGUNAN RISHA (LEVEL 2) |
6
|
| 130 |
APLIKATOR BANGUNAN RISHA (LEVEL 3) |
11
|
| 131 |
ANALIS STRUKTUR BANGUNAN RISHA |
4
|
| 132 |
AHLI MUDA GROUTING |
11
|
| 133 |
PENGAWAS PEKERJAAN BANGUNAN GEDUNG (LEVEL 6) |
9
|
| 134 |
AHLI MADYA GROUTING |
12
|
| 135 |
AHLI MUDA PENGELOLA RUMAH SUSUN |
14
|
| 136 |
PENGENDALI PELAKSANAAN PEKERJAAN JALAN |
7
|
| 137 |
PENGENDALI PELAKSANAAN PEKERJAAN JEMBATAN |
7
|
| 138 |
Ahli Muda Teknik Bangunan Gedung (Freshgraduate) |
10
|
| 139 |
Ahli Muda Teknik Jalan (Freshgraduate) |
11
|
| 140 |
Ahli Muda Teknik Jembatan (Freshgraduate) |
10
|
| 141 |
Ahli Muda Bidang Keahlian Teknik Sumber Daya Air (Freshgraduate) |
13
|
| 142 |
Ahli Muda Geoteknik (Freshgraduate) |
6
|
| 143 |
AHLI UTAMA TEKNIK TEROWONGAN |
14
|
| 144 |
AHLI MADYA TEKNIK TEROWONGAN |
13
|
| 145 |
AHLI MUDA HIDROLIKA |
6
|
| 146 |
AHLI MUDA MATERIAL JALAN |
6
|
| 147 |
TEKNISI LABORATORIUM BETON ASPAL (LEVEL 5) |
8
|
| 148 |
TEKNISI LABORATORIUM BETON ASPAL (LEVEL 6) |
10
|
| 149 |
JURU UKUR KONSTRUKSI |
4
|
| 150 |
AHLI MUDA KESELAMATAN JALAN |
6
|
| 151 |
AHLI MADYA KESELAMATAN JALAN |
7
|
| 152 |
AHLI MUDA PERENCANAAN JEMBATAN RANGKA BAJA |
5
|
| 153 |
AHLI MADYA PERENCANAAN JEMBATAN RANGKA BAJA |
6
|
| 154 |
PELAKSANA PEMELIHARAAN JEMBATAN (LEVEL 4) |
7
|
| 155 |
PELAKSANA PEMELIHARAAN JEMBATAN (LEVEL 5) |
8
|
| 156 |
AHLI MUDA TEKNIK BENDUNGAN BESAR |
28
|
| 157 |
AHLI MADYA TEKNIK BENDUNGAN BESAR |
39
|
| 158 |
AHLI MADYA OPERASI DAN PEMELIHARAAN BENDUNGAN TIPE URUKAN |
10
|
| 159 |
INSPEKTUR BENDUNGAN URUKAN (LEVEL 5) |
5
|
| 160 |
AHLI MADYA TEKNIK PERENCANAAN IRIGASI RAWA |
8
|
| 161 |
AHLI MUDA TEKNIK IRIGASI |
13
|
| 162 |
AHLI MADYA TEKNIK IRIGASI |
14
|
| 163 |
AHLI MUDA TEKNIK RAWA |
6
|
| 164 |
AHLI MADYA TEKNIK RAWA |
7
|
| 165 |
PELAKSANA PEMASANGAN PINTU AIR (LEVEL 5) |
5
|
| 166 |
AHLI MUDA PERENCANAAN OPERASI DAN PEMELIHARAAN PRASARANA SUNGAI SERTA PEMELIHARAAN SUNGAI |
7
|
| 167 |
AHLI MADYA PERENCANAAN OPERASI DAN PEMELIHARAAN PRASARANA SUNGAI SERTA PEMELIHARAAN SUNGAI |
8
|
| 168 |
AHLI MUDA TEKNIK PANTAI |
18
|
| 169 |
AHLI MADYA TEKNIK PANTAI |
19
|
| 170 |
PELAKSANA LAPANGAN PEKERJAAN BANGUNAN PENGAMAN PANTAI (LEVEL 4) |
5
|
| 171 |
AHLI MADYA HIDROLIKA |
7
|
| 172 |
PELAKSANA LAPANGAN PEKERJAAN BANGUNAN AIR LIMBAH PERMUKIMAN (SETEMPAT DAN TERPUSAT) (LEVEL 5) |
6
|
| 173 |
AHLI MUDA PERENCANAAN JARINGAN DRAINASE |
8
|
| 174 |
AHLI MADYA PERENCANAAN JARINGAN DRAINASE |
9
|
| 175 |
PENGAWAS LAPANGAN PEKERJAAN DRAINASE PERKOTAAN (LEVEL 5) |
6
|
| 176 |
AHLI MADYA GEOLOGI PEKERJAAN KONSTRUKSI |
8
|
| 177 |
AHLI MUDA GEOTEKNIK |
8
|
| 178 |
AHLI MADYA GEOTEKNIK |
11
|
| 179 |
TEKNISI GEOTEKNIK (LEVEL 5) |
5
|
| 180 |
AHLI MUDA HIDROGRAFI PESISIR |
5
|
| 181 |
AHLI MUDA SURVEI PEMETAAN UDARA |
8
|
| 182 |
MANAGER PROYEK SURVEI DAN PEMETAAN WILAYAH |
8
|
| 183 |
SPESIALIS SIG |
7
|
| 184 |
AHLI MADYA HIDROGRAFI LEPAS PANTAI |
5
|
| 185 |
AHLI MADYA KEWILAYAHAN |
8
|
| 186 |
AHLI UTAMA KEWILAYAHAN |
5
|
| 187 |
AHLI MADYA SISTEM INFORMASI GEOGRAFIS |
7
|
| 188 |
AHLI MUDA SURVEI TERESTRIS |
9
|
| 189 |
AHLI MADYA SURVEI TERESTRIS |
4
|
| 190 |
AHLI UTAMA SURVEI TERESTRIS |
3
|
| 191 |
OPERATOR UTAMA SURVEI TERESTRIS |
6
|
| 192 |
TEKNISI SURVEI TERESTRIS |
7
|
| 193 |
SURVEYOR REKAYASA |
10
|
| 194 |
SURVEYOR TERESTRIS |
10
|
| 195 |
OPERATOR MADYA SURVEI TERESTRIS |
5
|
| 196 |
PELAKSANA LAPANGAN PEKERJAAN PEMBANGUNAN JALAN REL (LEVEL 5) |
8
|
| 197 |
AHLI MUDA TEKNIK DERMAGA |
16
|
| 198 |
AHLI MADYA TEKNIK DERMAGA |
31
|
| 199 |
AHLI MUDA PELAKSANAAN PEMBONGKARAN BANGUNAN |
4
|
| 200 |
AHLI MADYA PELAKSANAAN PEMBONGKARAN BANGUNAN |
5
|
| 201 |
OPERATOR GROUTING |
7
|
| 202 |
PELAKSANA PENGEBORAN AIR TANAH (LEVEL 5) |
8
|
| 203 |
AHLI MADYA TEKNIK BANGUNAN GEDUNG |
33
|
| 204 |
AHLI MUDA PEMERIKSAAN JEMBATAN |
4
|
| 205 |
AHLI MADYA MATERIAL JALAN |
8
|